Monday, July 29, 2013

Remodel Continues



The porch had to be removed.  It was not supported correctly, and it was very low.


We stripped everything down to the studs and the original wood floors.  It was time for walls to come down and ceilings to be raised.  New plumbing, electrical, insulation, and roofing were added.
We added 600-700 square feet of Master bedroom, bath, and closet.

After the walls came down and ceilings were raised, the space looks and feels much larger.

No comments:

Post a Comment